Prudential Center Distributed Antenna System (DAS)

Installation of new Distributed Antenna System (DAS) equipment  to provide seamless 4G coverage on all levels of the entire Prudential Center complex and garage.

Our Role

  • Complex consists of 800 Boylston St, 111 Huntington Ave, and the Prudential Center garage
  • Furnish and install fiber optic cable and AC electrical infrastructure to establish power and network connectivity throughout the system

Workforce Required

  • 10 Electricians
  • 15 Technicians

Safety Incidents

Execution

  • Install ½” and 7/8” coaxial transmission cable and antennas, perform sweep testing and Passive Intermodal (PIM) testing to ensure 700mhz/4G LTE functionality per carrier standards
  • Furnish/install fiber optic backbone system
  • Scan and core risers of both towers
  • Furnish/install AC power and all coring and EMT pathways
  • Install DAS equipment
  • Install DAS cabling and antennas

Interesting Facts

  • All work performed on 3rd Shift in an occupied building
  • Tenant floors fully cabled, terminated, and tested one floor per night
  • Thousands of feet of EMT installed in garage levels
  • All DAS equipment on UPS/Battery Backup
  • 111 Huntington AC Power interfaces with building facilities monitoring system
  • Installed hundreds of antennas
Commercial
Client
Prudential Center Distributed Antenna System (DAS)
Project
Prudential Center Distributed Antenna System (DAS)

Installation of new Distributed Antenna System (DAS) equipment  to provide seamless 4G coverage on all levels of the entire Prudential Center complex and garage.